1. Preparing the Foundation & Site
- Meticulous site preparation – level, flat base prevents structural distortion and uneven stress.
- Stable foundation prevents long‑term settlement issues.
- Ensures tank remains securely anchored.
2. Positioning & Anchoring the Tank
- Careful positioning – use appropriate lifting equipment to avoid damaging bunded layer.
- Proper alignment ensures nozzles and pipe connections match site layout.
- Secure anchoring prevents shifting or tipping (high winds/seismic areas).
3. Connecting Piping & Ventilation Systems
- Seal all penetrations – prevent leaks at connection points.
- Adequate ventilation allows breathing during filling/emptying cycles.
- Prevents dangerous pressure buildup or vacuum collapse.
4. Final Inspections & Testing
- Comprehensive inspection – check bolts, seals, and welds.
- Leak test (water or approved medium) confirms primary and secondary containment are liquid‑tight.
- Only commissioned for safe operation after passing rigorous checks.