en Language
    no informain
News

Is pressure test required before using double wall waste oil tank

2026-06-08 Leave a message

1. Ensuring Structural Integrity

  • Essential pre‑service verification – confirms primary and secondary containment are free from defects, leaks, or weaknesses.
  • Ensures tank can safely withstand internal pressures.
  • Prevents environmental contamination and guarantees secure waste oil storage.

2. Testing Methodologies & Standards

  • Pressurize inner tank with air – monitor pressure gauge for any drop.
  • Apply soap solution over seams, welds, and fittings to visually detect escaping air bubbles.
  • Ensures compliance with stringent industry standards and manufacturer specifications.

3. Interstitial Space Verification

  • Thoroughly evaluate the interstitial space between inner and outer walls.
  • Confirms secondary containment is properly sealed and capable of capturing potential leaks.
  • Protects surrounding soil and groundwater from hazardous waste oil.

4. Regulatory Compliance & Safety

  • Mandated by regulatory bodies – failure to perform pre‑use test results in legal penalties and environmental liabilities.
  • Successful pressure test is a mandatory compliance step.
  • Ensures safe and legal operation throughout the tank's entire lifecycle.
Send Inquiry
code