What is installation procedure of vertical waste oil liquid storage tank

2026-06-09 Leave a message

1. Site Preparation & Foundation Construction

  • Level, stable location – must support full tank weight.
  • Reinforced concrete pad provides secure, impermeable base.
  • Prevents future settling or shifting that could compromise integrity.

2. Secondary Containment & Positioning

  • Construct and inspect bund before lifting tank into place.
  • Carefully hoist and position tank within secondary containment.
  • Captures waste oil safely in case of primary tank failure.

3. Piping Connections & Ventilation Setup

  • Install inlet/outlet pipes using leak‑proof fittings.
  • Properly sized vent allows air escape during filling and pressure equalization.
  • All connections must be tightly sealed and properly aligned for safe operation.

4. Final Inspection & Testing

  • Comprehensive inspection of all welds, seals, and piping connections.
  • Hydrostatic or pneumatic pressure test verifies leak‑free status.
  • Approved for operational use only after passing all safety tests.