1.Introduction
The lifting of the gear box drilling is pneumatic controlled and the gear box oil collecting unit has a rubber funnel, so that the whole operation process has no oil leakage, convenient installation and simple operation.
2.Technical data
Air Supply: 8.5 bar ~ 1.21 l/min
Drainage time: About 10 min/vehicle
Fluid Displacement:
Engine Oil: 3 l/m
3.Advantages
*Easy maintenance
*Pneumatic control
*Automatically lifting of drilling device
*Powerful air pump
*Easy operation
*Providing whole set, no need to install
4. FAQ
● What is the delivery time of your machine?
In general, the delivery time of our machine is about 30 days, customized machine will be delivered as the negotiation with our clients.
● As the shipping period will take long time, how can you make sure the machine won’t be broken?
Our machine is film wrapped, to make sure the machine can be delivered to our customer smoothly, we will use the steel wire to fix the machine with the container.
● May i know which payment will be accepted by your company?
So far 100%T/T before shipment, and 30% deposit paid by T/T, balance paid by L/C are available.
Hot Tags: gear box drilling, China gear box drilling manufacturers, suppliers, factory
If you want to learn more about low-priced products, please visit the following website: www.oilwastetank.com